TGW Logistics case study

TGW Logistics GmbH, based in Marchtrenk (Austria), is rolling out the P'X Industry Solution from Perspectix AG in Zurich at all its locations worldwide. Around 200 employees in Central Europe are already working with the solution for Computer Aided Planning & Engineering (CAP&E). Efficiency increases of 25 to 30 percent have been achieved.
How manufacturers (should) adapt to BIM

Building Information Modeling (BIM)
is changing traditional working methods and posing complex challenges. But in the digital transformation, the method is gaining acceptance among architects, planners, contractors and developers.
CAP&E: Five key advantages of parametric system configuration

For many plant manufacturers, it is not production but planning, design and coordination that is the real bottleneck in the company's performance. Find out here what innovation leaders are doing differently: Computer Aided Planning & Engineering (CAP&E) of industrial plants with the P'X Industry Solution from Perspectix opens up enormous efficiency gains. Read here how distributed teams create virtual plants from parameterized components in large halls.